日韩三级大片-久久夜色撩人精品国产-少妇av一区二区三区-欧美又粗又大aaa片-www.波多野结衣.com-欧美日韩成人在线-日本四虎影院-欧美www视频-竹菊影视欧美日韩一区二区三区四区五区-奇米91-91免费网址-97人妻中文字幕总站-黄色片视频免费在线观看-窝窝午夜看片成人精品-久久久亚洲一区-日韩在线影院-三级一区二区-高清精品一区二区三区-国产1区2区3区-欧美无遮挡

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.